中文字幕免费网站亚洲,久久久97精品,久久综和久久合,99中文字幕第一区,精品少妇一、二、三区,国产精品98久久久,青娱乐91,精品人妻高清麻豆av,97人妻精品免费视频

CN | EN

Xinjiang Oilfield's First Production Plant Group achieves significant results with energy storage fracturing

Release time:2026-07-18 Clicks:


As of May 15, the first batch of group energy-storing fracturing wells at Xinjiang Oilfield's First Production Plant (Hongshan Company) have shown impressive production performance after being put into operation. Among them, five wells are producing by natural flow, with a daily incremental oil production of 15 tons across the well group and an average daily increase of 1.7 tons per well.
The Keshang Formation reservoir in the Hong60 well area of the First Production Plant is a lithology-controlled structural reservoir, representing a typical medium-porosity, ultra-low-permeability reservoir with complex geological conditions. The block contains 29 oil and water wells, but due to a large well spacing of 350 meters, water flooding efficiency has been poor. Conventional fracturing measures have gradually lost effectiveness, resulting in a recovery factor of only 7.8% and significant remaining potential.
To overcome this development challenge, the First Production Plant developed a "multi-stage, grouped" energy-storing fracturing strategy based on geological parameters, implementing fracturing in four rounds across 15 wells—13 fracturing wells and 2 energy-storage wells. Using material balance methods, injection volumes were differentially designed, supplemented with 0.2% surfactant to enhance displacement efficiency. The total estimated fluid injection volume will reach approximately 150,000 cubic meters, averaging 10,000 cubic meters per well. Additionally, a combined technique of "in-fracture temporary plugging + fracture tip diversion" was applied, along with a 90-day shut-in period for fluid replacement, effectively expanding the fracture coverage area.
After implementation, the measures yielded remarkable results. In the first round, the average injection pressure of three wells increased by 1.8 MPa, indicating effective restoration of formation energy. During the second round’s energy storage phase, pressure indices and fill degrees of wells 0325 and 0331 steadily rose, while the fill degree of Hong85 well increased rapidly by 20.5% after adding temporary plugging agents. After production commenced, the block’s daily oil output steadily rose from the original 6 tons, with some wells experiencing leapfrog growth in production and continuous reduction in water cut, confirming the technical feasibility.


Home
Products
Application
Tel
佛学| 治多县| 沿河| 平阴县| 阳东县| 上蔡县| 五河县| 鄯善县| 南召县| 泰州市| 西乡县| 聂拉木县| 扶风县| 博白县| 沙田区| 乐昌市| 镇赉县| 凤翔县| 元谋县| 宝应县| 株洲市| 新巴尔虎右旗| 广汉市| 彭泽县| 广宁县| 象州县| 许昌市| 云安县| 民县| 惠来县| 利辛县| 交口县| 哈巴河县| 溧阳市| 镇雄县| 旺苍县| 康平县| 株洲县| 永寿县| 伊金霍洛旗| 乐业县|